| Author | Theint Han Su Kyaw |
| Call Number | AIT Proj. no.MPM-NPT-CM-16-07 |
| Subject(s) | Bridge construction industry--Risk management--Myanmar
|
| Note | A project submitted in partial fulfillment of the requirements for the
degree of Master of Engineering (Professional) in
Construction Engineering and Infrastructure Management |
| Publisher | Asian Institute of Technology |
| Abstract | Risk Management is a perception which becomes very popular in developing
countries. Most companies in developing countries establish a risk management procedure in
their projects for improving their performances and increase the benefits. Reducing risks
associated must be a major purpose for every project managers.
Infrastructure sector in Myanmar has been growing up to very rapid after 1988. Most
projects have been implemented in the limited construction period and budget. This leads to
risky problems. This case study emphasized to analyze that most of risks happened in this
bridge construction project. And it is also illustrated the strength and weakness of this project
due to past experiences. This thesis proposed to apply risk management for future bridges in
Myanmar. |
| Year | 2016 |
| Type | Project |
| School | School of Engineering and Technology (SET) |
| Department | Department of Civil and Infrastucture Engineering (DCIE) |
| Academic Program/FoS | Construction Engineering and Infrastructure Management (CM) |
| Chairperson(s) | Hadikusumo, Bonaventura. H. W.; |
| Examination Committee(s) | Chotchai Charoenngam ;Santoso, Djoen San ; |
| Degree | Project (M.Eng.) - Asian Institute of Technology, 2016 |