| Author | Phan Bunthoeun |
| Call Number | AIT Thesis no.ET-99-24 |
| Subject(s) | Electric power distribution--Cambodia--Sihanoukville
|
| Note | A thesis submitted in partial fulfillment of the requirements
for the degree of Master of Engineering. School of Environment Resources and Development
|
| Publisher | Asian Institute of Technology |
| Abstract | Distribution system is an integral part of the utility since the customer through this link
utilizes the energy generated. Thus, there is a need to constantly improve the system and be
prepared for the future so that the customer can avail of the benefits as well as the utility. The
improvement helps to reduce the losses and improve the voltage profiles of the distribution
system.
In this thesis attempt has been made to study what benefit can be obtained if the
existing system of 6.3 KV Sihanoukville distribution network is changed with 22 KV system
along with change in the conductors. Also studied was the benefit of placing the capacitor at
optimal location obtained through the RSLOCl.EXE and RDLFl.EXE.
It was found that by changing the operational voltage of the system voltage profile in
the system is better with marked reduction in losses which thus prepares the utility for fu1ther
addition of loads in the years to come. Similarly, by placing the capacitors at optimal locations
the losses in the system can be further reduced providing additional benefits. |
| Year | 1999 |
| Type | Thesis |
| School | School of Environment, Resources, and Development |
| Department | Department of Energy and Climate Change (Former title: Department of Energy, Environment, and Climate Change (DEECC)) |
| Academic Program/FoS | Energy Technology (ET) |
| Chairperson(s) | Dhadbanjan, Thukaram |
| Examination Committee(s) | Yu, Cun Yi ;Surapong Chirarattananon ; |
| Scholarship Donor(s) | Sida; |
| Degree | Thesis (M.Eng.) - Asian Institute of Technology, 1999 |