Development of a fully computerized construction management package

AuthorYau, Cheuk-wa
Call NumberAIT Thesis no. ST-89-23
Subject(s)Construction industry--Computer programs
NoteA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractLevelling of resources in networl<s is a very common topic in operations research. However, most of the work done concerns the activity on arrow network. There is very little work done about t he levelling problem for precedence networl<. A study on the levelling of resources for the precedence network has been carried out a nd a heuristic algorithm has been suc cessfully developed to handle this problem. The a lgorithm is then written in MS Fortran language and is linl<ed with the existing subroutines developed by former researchers at AIT to feather the software PREC-NET to become a fully computerized package. Now PREC- NET can ha ndle the problems of CPM a nalysis, graphic generation, cash flow generation, resources scheduling and resource levelling analysis.
Year1989
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Information and Communications Technologies (DICT)
Academic Program/FoSStructural Engineering (STE) /Former name = Structural Engineering and Construction (ST)
Chairperson(s)Chauhan, Roshan Lal ;Worsak Kanok- Nukulchai
Examination Committee(s)Jearkjirm, Vithool
Scholarship Donor(s)Mr. John L. Marden
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1989