| Author | Supachai Udomsomporn |
| Call Number | AIT RSPR no. ET-86-5 |
| Subject(s) | Atomic power--Thailand--Economic aspects
|
| Note | A research study (7 credits) submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development |
| Publisher | Asian Institute of Technology |
| Abstract | Exploitation of energy sources for generating electricity
should be studies and performed carefully. In this paper, a
tec hni c to reduce the initial cost of electricity generation and
the suitable si z e of nuclear power plant are studies.
The revenue requirement is applied in the study by taking
into account of some economic assumtions. The result obtained
will be a trend for planning the nuclear energy for electricity
generating for Thailand in the future.
From the study, By determining the cost of power plant at
1 200 MW. It can be found that, the costs of nuclear power plant
i s cheaper about 30 % than the coal-fired plant. The plant should
be separated into small size, for instance , 4x300 MW, to get more reliability. |
| Year | 1986 |
| Type | Research Study Project Report (RSPR) |
| School | School of Environment, Resources, and Development |
| Department | Department of Energy and Climate Change (Former title: Department of Energy, Environment, and Climate Change (DEECC)) |
| Academic Program/FoS | Energy Technology (ET) |
| Chairperson(s) | Sauter-Servaes, Florian
; |
| Examination Committee(s) | Lucas, N.J.D. ;Prida Wibulswas ; |
| Scholarship Donor(s) | The Government of Australia ; |
| Degree | Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1986 |