AI Search
Home
Advanced Search
Browse
by Author
by Title
by Subject
by Year
by Academic Program/FoS
by Callnumber
by Type
Contact Us
Login
Select a search option
Author
Title
Subject/Keyword
Year
Academic Program/Field of Study (FoS)
Call Number/Thesis Number
Chairperson
Examination Committee
Scholarship Donor
Search Now
Results For * in ALL Fields
23687 Results on May 28, 2026
Browse by School
S E R D
S E T
S O M
(S E R D) + (S E T)
(S E R D) + (S O M)
S A T
School of Civil Engineering
Student Research Before 1980
Browse by Type
Capstone Project
Dissertation
Past Examination Papers
Project
Research Report
Research Study Project Report (RSPR)
Special Study Project Report (SSPR)
Thesis
Sort by
Title Asc
Title Desc
Project schedule delay and risks in rural infrastructure development project : a case study of rehabilitation of calamity damage in Vietnam
by
Bui Duc Luong
Callnumber:
AIT Proj. no.MPM-CM-10-42
Project schedule delay in infrastructure construction in North Vietnam : a case study of Noi Bai-Laocai Highway Project-Package A3
by
Tran Le Minh Triet
Callnumber:
AIT Proj. no.MPM-CM-13-08
Project schedule internal risk management in EPC Gas Pipeline Project: a case study of Block B - O Mom Gas Pipeline Project
by
Pham Binh Lam
Callnumber:
AIT Proj. no.MPM-CM-11-04
Project schedule planning approach in uncertain environments
by
Andi
Callnumber:
AIT Thesis no. ST-98-44
Project schedule, cost planning and control in road construction projects : a case study of Zalun-Hinthada-Ingapu-Myanaung-Kyangin Road
by
Yan Myo Aung
Callnumber:
AIT Proj. no.MPM-MM-CM-22-24
Project scheduling and material procurement : a case study of a hospital construction project
by
Rose Mary Seng
Callnumber:
AIT Proj. no.MPM-MM-CM-25-01
Project scheduling planning and control system for a large scale project :|ba case study of Pah-Sak Dam Project
by
Nattaset Thirawattanakorn
Callnumber:
AIT Thesis no.ST-97-39
Project scheduling with time cost trade-off resource constraints
by
Le Anh Binh
Callnumber:
AIT Thesis no. ISE-02-12
Project scheduling with time, cost and quality considerations : model and application in a cement factory project
by
Yin Mon Myint
Callnumber:
AIT RSPR no.SM-97-2
Project selection via interactive multiobjective programming :Nepal Electricity Authority
by
Shrestha, Sujit
Callnumber:
AIT Thesis no. ISE-98-29
First
Prev
1811
1812
1813
1814
1815
Next
Last